Question/Problem:
Site reported conveyance PLC-controlled lines not running and all electrical checkouts have been performed.
This has been identified as a well known fix for the MBP area at DC 6027 (Woodland, PA).
Environment:
Schneider Electric, PLC, Modicon M340, Control Expert, Proworx32, TopHat.
Answer/Solution:
1.- Power off the affected Control Panel.
2.- Identify the affected TopHat module(s).
3.- Leave the CP off for 5 mins solid.
4.- Have site reseat the comm adapter. Make sure it is reseated all the way in.
Site will need a small flathead screwdriver for removal.
Disassembly:
Assembly:
5.- Power up the CP and test.